← BuyAlways ADEF
Sign Up Sign In

Build a synth. Play it in your DAW.

Not a preset browser — a synth builder. Make an instrument here in your browser in one click, download it, and it opens in the free ADEF Player as a fully editable, fully automatable VST3 or AU — on Mac and Windows. No account. No purchase. Nobody else does this.

01What this is

🎲 You get a SYNTH, not a preset

This doesn't hand you a stored sound. It builds you an instrument — oscillators, filter, envelopes, modulators, wired together — and in the plugin every one of those is a live control you can turn, and a parameter your DAW can automate. Sweep the filter across eight bars. Draw the envelope in. It's your synth, and it behaves like one.

🔌 Plays in your DAW, free

ADEF Player is a free AU / VST3 / standalone plugin for Mac and Windows. It loads any ADEF preset — including UNIQUENCER patterns, arpeggios and modulators — and gives you five stereo outs. You never have to buy anything to play what you roll here.

🎛️ The full synth is Mac-only, for now

The ADEF Multi Poly Synth app — where you build racks, sequence, arrange songs and export — is a paid Mac app. A Windows version arrives with the JUCE port. Until then Windows gets the plugin and this generator, free.

🥁 Your sounds are welcome here

We host no sample packs. What lives here is the things that make sounds: presets, kits, projects and tracks. If your drum kit is built from your own sampling, upload it — that's exactly what this is for.

02How to use it

Get the free plugin

Download ADEF Player for your machine from section 05 below, and drop it in the plugin folder for your OS — the exact path is on the download card, with a copy button.

Roll a synth

Section 03. Pick role, style and wildness, hit ROLL. Preview it right here in the browser before you commit to anything.

Download the preset

It saves as a .json ADEF preset. Your browser puts it in Downloads, which is one of the folders the plugin's LOAD browser already looks in — so there is usually nothing to move.

Load it in your DAW

Open ADEF Player on a track, hit LOAD, pick the file. Play. Every knob on the face is a host-automatable parameter.

Silent? Check the output bus

ADEF Player has five stereo outs — Main plus FX1–FX4. The FX ones are aux sends, and most DAWs do not route them until you ask. If a preset loads and you hear nothing, look at the OUT card: if the bus reads FX1 (or FX2/3/4), switch it to DRY and it comes back. Everything on this page ships on DRY, but a preset somebody else uploaded may have been saved inside a session that had its auxes wired up.

Share what you make

Built something good in the Mac app? Upload it in section 04 so somebody else can play it.

03Build a synth
CHECKING AGAINST 0 FACTORY PATCHES
One click builds you a whole instrument, and it arrives in the plugin with every knob live and every parameter exposed to your host — nothing is baked in. Free, no account. Each build is checked against the entire factory library, so what you get has never existed before. Same seed, same synth, forever — the link rebuilds it exactly.
🎲 PRESET GENERATOR
5
PRESS ROLL
nothing has been generated yet
About the preview: it is a quick Web Audio approximation built from the patch's oscillators, filter and envelope — enough to tell a bright pluck from a dull pad. It is not the ADEF engine: FM, waveshaping, ADEF WAVES, the UNIQUENCER and the modulation matrix are not in it. The downloaded file is the real thing — load it in the plugin to hear the patch properly.
03bThe UNIQUENCER
⇉ A SEQUENCER THAT SEQUENCES EFFECTS, NOT NOTES
The UNIQUENCER panel — step strip with each step's curve drawn over the baked waveform, the per-segment edit panel, and the global panel with DURATION, QUANTISE and RETRIGGER.
Each step's curve drawn straight over the voice's own waveform — you read the pattern as a silhouette, before a single number.

It is a per-step effect sequencer that runs inside the voice, in the audio path — not on the bus afterwards. That distinction is the entire reason it exists.

Every other unit in ADEF's modulation path is instantaneous. The filter, the compressor, the EQ, the overdrive, the waveshaper — each one answers the modulation value at that sample and remembers nothing about the sample before it. The only time-based effects lived at bus level, after the voice was already built, so they smeared the whole patch instead of dirtying it from the inside. Eric, starting the design: “I could not find or make a preset that is Serum dirty, and now I know why.”

The invention is clocks nested three deep. A PATTERN is a musical length — bars and beats — divided into STEPS. Each step picks one effect. DIVISION then cuts that step into SEGMENTS, and every segment sweeps that effect's main parameter from its own minimum to its own maximum, along its own curve, in its own direction. Pull the segment handles down and the effect arrives and then stops dead, leaving a hole — an instant gater.

PATTERN→ STEP→ SEGMENT 1 bar @ 1/16 = 16 steps · each step ÷ 4 = 64 sweeps

Eighteen effects — the 303 and ADEF filters, flanger, phaser, crush, delay and filter-delay, three types each — built on three engines rather than eighteen one-offs, so they behave consistently instead of each having its own character bugs.

★ It locks to your song

Set RETRIGGER ▸ FOLLOW and the pattern is wherever the bar is — not wherever your finger landed. It reads your DAW's own clock, so it survives a locate, a loop jump and a stop/start, two instances agree with each other, and what you bounce is what you heard. Change the session tempo mid-note and the pattern stretches with it instead of lurching.

Reading the preset cards below: a preset set to KEY restarts its pattern at every note-on — that is by design, and it means it will not line up with your bar line. FOLLOW is the mode that locks to the song. If sync is ever the complaint, check RETRIGGER first.

The generator rolls voices, not patterns — so these are hand-built. Every one carries a live UNIQUENCER, and every one is pure synthesis with no samples in it, which means it loads and plays identically on Mac and Windows. Load one in ADEF Player and hold a chord.
UNIQUENCER patterns — on their own
A pattern is not a preset — it is only the sequencer. Download one, hit UQ LOAD in ADEF Player, and it drops onto whatever synth you already have open. That is how you put the pattern from one sound onto a completely different one.
04Community library
Presets, kits, projects and tracks made by people using ADEF. Downloads are free. Instruments (.erx10) live on the Ensoniq page — don't cross the two libraries.
Role
Style
🎛️

Loading…

05ADEF Player — free
The player is free on both platforms, forever. It loads any ADEF preset — UNIQUENCER, arpeggios and modulators included — syncs to your host's tempo, and gives you five stereo outs (Main + FX1–FX4) plus a sidechain input.
↓ DOWNLOAD

🍎 macOS v1.3.0 · LIVE

AU · VST3 · universal (Apple Silicon + Intel) · signed & notarized by Apple
AU goes here
~/Library/Audio/Plug-Ins/Components
VST3 goes here
~/Library/Audio/Plug-Ins/VST3

🪟 Windows v1.3.0 · LIVE

VST3 · 64-bit · ships as a ZIP, no installer · presets included
VST3 goes here
C:\Program Files\Common Files\VST3
Presets you download go here
%USERPROFILE%\Documents\ADEF Presets
06About samples
⚖ WHAT WE HOST, AND WHAT WE DON'T

byME hosts nothing sampled. There are no factory sample packs here, no sample marketplace, and no ASR-10 library. ADEF reads your own disks — you bring the sounds you already own.

What lives here is the things that make sounds: synth presets, drum kits, projects and tracks. When those carry your own recordings, that is welcome and encouraged — a kit you built by sampling your own hardware is exactly what this library is for.

What we ask. When you upload, you're telling us the material is yours or licensed for you to pass on. We don't run automated scanners over your work — a machine can't tell your kick drum from anyone else's, and we're not going to insult you by pretending it can. A person reviews new uploads weekly. If something turns out to be unlicensed we'll take it down and tell you why.

Please don't upload commercial sample packs, ripped ROM content, or anything you'd be uncomfortable putting your own name on. It's a small community — that's what keeps this simple for everybody.

“
It's like giving someone a car radio that is fully functional, and downloaded CDs play in it. But somewhere you gonna want the car — at a price.
Eric McCallaghan · on why the plugins are free